KAR-IN offers railway oriented infrstructure for test and develpment of new concepts of sustainable mobility
The Track
- length: 31 km
- Maximale Neigung: 17 Promille
- max. speed: 60 km/h (increase to 80km/h possible)
- 45 level crossings (22 public)
- 3 railway stations, 8 stops
- 3 shunting areas, Loading ramps
- storing yards for rolling stock
- not electrified !
Infrastructur
- workshop w. machinery
- short term storage, extension space
- office-space, rooms for seminars and meetings, internet access
- hotels nearby
- e-charging points available
Framework
- accepted by the public
- rare populated regions
- synergies with ecological energy production and many more technology partners
Perspektives & Options
- Driving test of new vehicles & machinery, trainings therefore
- Research, development and evaluation
- Evaluation of new mobility concepts
- Testbed for new (e-)mobility-concepts for the regional and interrural transport
- Testbed for w technologies related to the building of railway tracks / training under real conditions
- Hosting von scientific work (e.g. bachelor/master)
- Testbed for „automated / autonomous driving “ up to level GA5 („Gailtaler Living Room“)